Customization: | Available |
---|---|
After-sales Service: | Engineers Available to Service Machinery Overseas |
Warranty: | 12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
HS-YFJ Series EPS styrofoam batch pre-expander machine main features:
Item | Unit | HS-FYJ-1300L | HS-FYJ-1800L | |
Barrel | Height | mm | 1500 | 1800 |
Diameter | mm | Φ1100 | Φ1300 | |
Volume | mm | 1.4 | 2.4 | |
Steam | Inlet | Mm | DN50 | DN65 |
Pressure | Kg/cm2 | 3~6 | 3~6 | |
Compressed air | Inlet | mm | DN40 | DN50 |
Pressure | Kg/cm2 | 4~5 | 4~5 | |
Density | 12g/l | Kg/h | 450 | 600 |
18g/l | Kg/h | 550 | 750 | |
20g/l | Kg/h | 680 | 880 | |
25g/l | Kg/h | 950 | 1150 | |
Expanding time | S | 100~115 | 110~120 | |
Installing power | KW | 18.6 | 18.6 | |
Overall size | M | 3.2*2.3*4.4 | 3.4*2.5*4.7 | |
Weight | Kg | 3000 | 3500 |
Zhejiang Huasheng Machinery Equipment Co., Ltd, located in Fuyang, Hangzhou City, China, is a manufacturer
for high-end EPS foam machinery and EPS moulds.
Huasheng has developed into a modern and standardized production base with an area of over 18, 000 square meters,
more than 100 employees and a team of highly qualified and educated researchers, and obtained 15 invention patents.
The main products include high-precision automatic pre-expander machine, fully automatic shape molding machine ,
EPS block moulding machine, EPS foam mold, EPS lost foam white area equipment etc.
We warmly welcome all customers and friends from both domestic and abroad.
Q: Are you a factory or trading company?
A: We are a factory of EPS machine and EPS mold.
Q: what is your payment term?
A: 30% down payment upon order confirmation, 70% balance payment before shipment.
Q:what is your delivery time?
A: It takes usually 45-60days for machines, and 25-30days for EPS mold.
Q: Do you send engineer to our local place to instruct installation?
A:Yes,if you need,we will arrange engineer for you,and we can provide turn-key job.
Q: Warranty?
A: One year warranty after installation is completed.During warranty period, for broken parts not by man-made and wear parts, factory seller will replace free of charge. the shipping cost will be borne by buyer, seller will equip standard spare wear parts to buyer.